Client: Private, Dubai - UAE
Consulting, Planning, Designing, Supply & Installation for Ultra high purity gas system into Synthetic Diamond Laboratory. We deliver end to end process along with MPCVD machine manufacturer to establish first of its kind lab grown diamond lab in Dubai.
UHP Gas system for Inert and flammable gases includes, supply and orbital weld installation of SS 316 CP seamless pipes, CP SS fittings, UHP Manifolds, UHP point of use regulators, Solenoid valves, Diaphragm valves, NRVs, cylinders, fire proof cabinets.
MPCVD Machine installation includes, electrical fittings, chilling water system and supply, gas connections and flammable gas exhaust system.
Gas detection system installation includes, Gas and smoke detectors, PLC panel and its integration, Alarm system with auto shut off valves.
Client: Sharjah Govt.
Complete renovation of Lab, Fit out work- which includes lab designing and planning, MEP work and civil work, supply and installation of Lab Furniture, Lab equipment, Low pressure exhaust system, Lab gas system including high purity gas SS pipe, fittings & point of use regulators.